Spark blog background

VR SOP Training for Heat Pump Manufacturing & Installation

VR SOP Training for Heat Pump Manufacturing & Installation

Relevant case studies

Blog post: 23/11/2025 12:50 pm
Spark Team Author: Spark Team

VR SOP Training for Heat Pump Manufacturing & Installation

Right-first-time builds and reliable installs—every time

Heat pumps involve refrigeration, electrics and careful commissioning. Spark designs bespoke VR training that mirrors your factory builds (brazing, wiring, leak tests), charge/evac routines and field install/start-up—so teams master the method safely.

Typical challenges

  • Refrigerant integrity: brazing cleanliness, evacuation and charge accuracy.
  • Electrical checks: insulation/earth tests, controls and sensor setup.
  • Hydronics: flow rates, purge, balancing and antifreeze where needed.
  • Commissioning: control tuning, performance checks and documentation.

How the bespoke build works

  1. Capture SOPs & limits: WIs, test scripts and install standards.
  2. Create scenarios: factory build, leak/pressure tests, site install and fault recovery.
  3. Coach in VR: prompts matched to your forms and HMIs.
  4. Assess: first-time pass, callback drivers and safety behaviours.

Benefits

  • Fewer leaks and call-backs.
  • Stable performance and customer satisfaction.
  • Audit-ready evidence for warranty and compliance.

Why Spark

Your models, your test limits, your install playbook—built into a practical training twin.

Ready to scope a heat pump VR SOP trainer? Contact Spark.