VR SOP Training for EV Charging Hardware: Build & Install

Standardise assembly and site installs—with clear, safe steps

Charge points must be built right and installed safely. Spark creates bespoke VR training around your enclosure/PCBA build, cable/connector fit, firmware/provisioning and field install/commissioning—so teams practise end-to-end.

Common pain points

  • Assembly: gasket compression, torque, thermal paths and IP rating.
  • Electrical safety: isolation, earthing, RCD/RCM checks and lockout.
  • Commissioning: firmware, OCPP join, payment checks and load management.
  • Documentation: photos, site packs and handover records.

Our build approach

  1. Capture SOPs: WI, limits and install checklists.
  2. Create scenarios: factory build, replace/repair, site install and fault response.
  3. Coach in VR: prompts matching your app/handheld flows.
  4. Assess: right-first-time, missed steps and safety behaviours.

Benefits

  • Fewer site revisits and warranty claims.
  • Safer energisation and clearer records.
  • Consistent installs across contractors and regions.

Why Spark

We train your exact hardware and field process—no generic courses.

See an EV charging VR SOP demo. Contact Spark.