VR SOP Training for HV Substation Build & Commissioning
Author: Spark Team
VR SOP Training for HV Substation Build & Commissioning
Safer energisation and cleaner handovers
Substations bring together civils, primary plant and protection relays. Spark creates bespoke VR training that mirrors your layouts, switching schedules, relay settings, CT/VT checks and SCADA points—so teams practise the exact sequence before live HV work.
Typical challenges
- Build & test: foundations, earthing, SF₆/gas checks and wiring verification.
- Protection & control: relay settings, primary/secondary injection and interlocks.
- Energisation: permits, switching, phasing checks and contingency plans.
- Handover: as-built docs, redlines and operations briefing.
How our bespoke build helps
- Capture SOPs & limits: switching sheets, FAT/SAT scripts and RAMS.
- Create scenarios: panel wiring checks, relay trip tests, first energisation and fault response.
- Coach in VR: prompts matched to your SCADA/RTU and checklists.
- Assess: right-first-time, safety holds and document completeness.
Benefits
- Reduced switching risk and incidents.
- Faster, confident commissioning.
- Audit-ready evidence for utilities and owners.
Why Spark
Your switching rules, your relay schemes—encoded into clear, repeatable training your teams will use.
Ready to scope a substation VR SOP programme? Contact Spark.