Spark blog background
Categories

Energy

Blog post: 04/11/2026 3:44 pm
Spark Team Author: Spark Team

AR-Guided BESS Maintenance: Bringing SOPs to the Technician at the Point of Work

Maintenance engineers working across Battery Energy Storage Systems may need to navigate large quantities of equipment information and procedural documentation. Bespoke AR can place the right approved information closer to the physical asset, while VR can prepare technicians for the maintenance task before they arrive onsite.

READ FULL ARTICLE
Blog post: 22/10/2026 3:03 pm
Spark Team Author: Spark Team

VR Arc-Flash Awareness Training for BESS and High-Voltage Infrastructure

Arc-flash hazards are difficult to communicate through diagrams alone. VR can turn electrical safety procedures into memorable interactive scenarios, helping personnel understand boundaries, equipment condition, PPE decisions and stop-work behaviours without exposing learners to an actual electrical event.

READ FULL ARTICLE
Blog post: 09/10/2026 1:43 pm
Spark Team Author: Spark Team

VR Emergency Response Training for Battery Energy Storage Systems

Battery Energy Storage System emergencies may require operators, control-room personnel, contractors and emergency responders to coordinate quickly around an unfamiliar and potentially evolving situation. VR enables organisations to rehearse these incidents safely and repeatedly before they happen.

READ FULL ARTICLE
Blog post: 28/09/2026 1:55 pm
Spark Team Author: Spark Team

Battery Container Access Training: Using VR and AR to Improve BESS Safety

Entering or working around battery containers can involve electrical, fire, gas, access and procedural considerations. Bespoke VR training gives personnel the opportunity to learn the physical environment and practise access procedures before entering the real facility, while AR can support inspections and equipment identification during authorised work.

READ FULL ARTICLE
Blog post: 15/09/2026 1:52 pm
Spark Team Author: Spark Team

VR and AR for BESS Commissioning: Reducing Mistakes Before Grid Connection

Commissioning a Battery Energy Storage System involves multiple assets, teams and procedural dependencies. Bespoke VR can allow commissioning personnel to rehearse the sequence before work starts, while AR can provide asset-specific information and guided checks at the physical installation.

READ FULL ARTICLE